Legislation Details

File #: 26-142    Version: 3 Name:
Type: Public Hearings Status: Agenda Ready
File created: 3/12/2026 In control: Planning Commission
On agenda: 6/18/2026 Final action:
Title: Planning Commission conduct a public hearing and adopt a resolution approving a modification to Site Plan and Design Review SPC-23-44 for the Little Kamper Propane Project located at 2055 Moffat Blvd. (APN 228-050-25).
Attachments: 1. Attachment 1 - Original Staff Report Dated December 21, 2023, 2. Attachment 2 - PC Resolution, 3. Attachment 3 - Exhibit 'A' - Conditions of Approval, 4. Attachment 4 - Original Plan Set dated 12/04/ 23, 5. Attachment 5 - Revised Plan Set 04/02/2026, 6. Attachment 6 - Staff Presentation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

Planning Commission Agenda

Memo to:

Manteca Planning Commission

 

 

From:

Jesus R. Orozco, Deputy Director of Development Services - Planning

 

 

Prepared by:

Allison Diaz, Assistant Planner

 

 

Date:

June 18, 2026

 

 

Subject:

Little Kamper Propane Modification (SPC-23-44)

 

Recommendation:

title    

Planning Commission conduct a public hearing and adopt a resolution approving a modification to Site Plan and Design Review SPC-23-44 for the Little Kamper Propane Project located at 2055 Moffat Blvd. (APN 228-050-25).

body

Background Information:

APPLICATION NO.: SPC-23-44 MOD

 

APPLICANT: Little Kamper LP, Inc., 1915 Moffat Blvd. Manteca, CA 95336

 

PROJECT LOCATION: 2055 Moffat Blvd. Manteca, CA 95336 (APN: 228-050-25)

 

PROJECT DESCRIPTION:

A request for a modification to the previously-approved Site Plan and Design Review entitlement (SPC 23-44), allowing for the development of a new office, processing building, and two storage buildings to process and store refillable 1 lb. liquid propane tanks. The proposed project includes five buildings to be constructed: a 2,100 square foot office, a 6,890 square foot processing building, a 270 square foot fire pump house, and 2 storage buildings at 7,200 and 6,763 square feet. The modification entails a minor reconfiguration of the building design and orientation of Building #2 with negligible changes in building square footage.  In addition, the Project modification entails a phasing plan for the development of the buildings in two (2) phases. Further, the modification will reset the expiration date, allowing for construction to begin two (2) years from the approval of this modification, with a one (1) year lapse between phases. The Conditions of Approval have been revised to reflect the Project’s modifications.

 

 

ENVIRONMENTAL DETERMINATION:

The Project was previously cleared by the Planning Commission (December 19, 2023) from further environmental review pursuant to Section 15332(In-Fill Development Projects) of the California Environmental Quality Act Guidelines. Because there are no substantive changes to the Project’s size or scope, there is no further environmental review warranted as a result of this modification to the conditions of approval.

 

Documents Attached:

Attachment 1 - Original Staff Report Dated December 21, 2023

Attachment 2 - PC Resolution

Attachment 3 - Exhibit ‘A’ - Conditions of Approval

Attachment 4 - Original Plan Set dated 12/04/2023

Attachment 5 - Revised Plan Set dated 04/02/2026  

Attachment 6 - Staff Presentation