Manteca CA banner
File #: 24-501    Version: 1 Name:
Type: Consent Status: Agenda Ready
File created: 9/12/2024 In control: CITY COUNCIL
On agenda: 10/1/2024 Final action:
Title: Approve partial acceptance of public improvements for Villa Ticino West Unit No. 3, Tract 4124, in accordance with the Subdivision Partial Acceptance Policy.
Attachments: 1. Attachment 1 - Location Map, 2. Attachment 2 - Construction Inspector Memorandum
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

City Council Agenda

Memo to:

Manteca City Council

 

 

From:

Kevin Jorgensen II, Director of Engineering/City Engineer

 

 

Prepared by:

Lauren Silva, Associate Engineer

 

 

Date:

October 1, 2024

 

 

Subject:

Villa Ticino West Unit No. 3 Partial Acceptance of Public Improvements

 

Recommendation:

title    

Approve partial acceptance of public improvements for Villa Ticino West Unit No. 3, Tract 4124, in accordance with the Subdivision Partial Acceptance Policy.

 

body

Background:

The City Council approved the Improvement Agreement and Final Map for Villa Ticino West Unit No. 3 on December 19, 2023. Villa Ticino West Unit No. 3 will subdivide 42.43 acres of land into 123 residential lots, a park/storm drain basin lot, and public rights-of-way. The estimated cost of the improvements is $9,226,628.59, as included in the Improvement Agreement.

 

The installed improvements include all underground utilities (both wet and dry), curb, gutter, sidewalk, street pavement, street markings, street signage, street lighting, sewage systems, storm drainage systems, water systems, perimeter fencing and the park.

 

JEN California 23, LLC, developer of the Villa Ticino West Unit No. 3 subdivision, has requested to construct and occupy completed homes prior to final acceptance of the subdivision public improvements. This partial acceptance will establish legal access to all parcels but does not accept maintenance of the public improvements, which will remain with the Developer. This partial acceptance does not initiate the one-year warranty period for the improvements. The warranty period begins with the final acceptance of the public improvements.

 

Public improvements necessary for the ingress and egress and the public utilities have been completed in accordance with the approved plans. There are no health and safety items outstanding.

 

The City will retain possession of the Performance Bond; the one-year warranty period on all of the public improvements will not commence until all of the improvements are completed and the City Council approves exoneration of the Performance Bond.

 

It is recommended to approve partial acceptance of public improvements in accordance with the Subdivision Partial Acceptance Policy, Resolution 2008-150, at Villa Ticino West Unit No. 3, Tract 4124, with the condition that the Performance Bond will be retained until all public improvements are completed to the satisfaction of the City Engineer and the Engineering Department.

 

Fiscal Impact:

There is no fiscal impact associated with this action.

 

Documents Attached:

1.                     Attachment 1 - Location Map

2.                     Attachment 2 - Construction Inspector Memorandum