Legislation Details

File #: 26-302    Version: 1 Name:
Type: Consent Status: Agenda Ready
File created: 5/26/2026 In control: CITY COUNCIL
On agenda: 6/16/2026 Final action:
Title: Adopt a resolution determining Tom Mayo Construction, Inc. to be the lowest, responsive, and responsible bidder for the Shasta Park Area Pavement Improvement Project 2.0 (District 3: bounded by Main Street, Louise Avenue, North Street, and SR 99) ("Project"); unencumbering $656,835 from CIP ENG26001 and reallocating funds to CIP ENG26038 in the Gas Tax/Street Improvement SB1 Fund (Fund 425); awarding the Project construction contract to Tom Mayo Construction, Inc. in the amount of $2,397,248; approving a project contingency of $359,587; and authorizing the City Manager or designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution.
Attachments: 1. Attachment 1 - Resolution, 2. Attachment 2 - Location Map, 3. Attachment 3 - Construction Contract
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

City Council Agenda

Memo to:

Manteca City Council

 

 

From:

Michael Selling, Assistant Director of Engineering/City Engineer

 

 

Prepared by:

Toshiro Sessoms, Assistant Engineer;  Somporn Boonsalat, Deputy Director of Engineering

 

 

Date:

June 16, 2026

 

 

Subject:

Shasta Park Area Pavement Improvement Project 2.0 (District 3: bounded by Main Street, Louise Avenue, North Street, and SR 99)

 

Recommendation:

title    

Adopt a resolution determining Tom Mayo Construction, Inc. to be the lowest, responsive, and responsible bidder for the Shasta Park Area Pavement Improvement Project 2.0 (District 3: bounded by Main Street, Louise Avenue, North Street, and SR 99) (“Project”); unencumbering $656,835 from CIP ENG26001 and reallocating funds to CIP ENG26038 in the Gas Tax/Street Improvement SB1 Fund (Fund 425); awarding the Project construction contract to Tom Mayo Construction, Inc. in the amount of $2,397,248; approving a project contingency of $359,587; and authorizing the City Manager or designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution.

 

body

Background:

The City Council stressed the importance of having a preventive pavement maintenance program in place to prolong existing pavement life and reduce more costly repairs in the future.

 

To expedite the construction schedule and optimize use of local funds, staff has prepared the Plans, Specifications, and Estimate (“PS&E”) for the Shasta Park Area Pavement Improvement Project 2.0 (“Project”). The Project includes: placement of asphalt overlay, microsurfacing, and rubber cape seal, on streets within the project area, and new striping.

 

On May 12, 2026, the City Council approved the PS&E, California Environmental Quality Act Notice of Exemption determination, and authorized a Call for Bids.

 

On May 15, 2026, the Project was advertised for bid in the local newspaper and posted on the City’s website.

 

On June 4, 2026, City received and opened seven (7) bids:

 

Contractor

Base Bid

Total Contract Amount

Tom Mayo Construction, Inc.

$2,397,248.00

$2,397,248.00

VSS International, Inc.

$2,422,211.00

$2,422,211.00

Knife River Construction

$2,496,000.00

$2,496,000.00

American Pavement Systems, Inc.

$2,499,824.05

$2,499,824.05

United Pavement Maintenance

$2,517,260.65

$2,517,260.65

Consolidated Engineering, Inc.

$2,723,869.10

$2,723,869.10

Martin Brothers Construction

$2,946,663.20

$2,946,663.20

 

The lowest bid is within the Engineer’s expected cost range.

 

Fiscal Impact:

Staff recommends unencumbering $656,835 from the 2025 Pavement Maintenance Project CIP ENG26001 and reallocating funds to CIP ENG26038 in the Gas Tax/Street Improvement SB1 Fund (Fund 425).

 

The expense breakdown of the total project cost is as follows:

 

Description

Original Contract

Estimate

Total

Construction Contract

 $ 2,397,248.00

            -

$ 2,397,248.00

Project Contingency

            -

$ 359,587.00

$    359,587.00

Total

 $ 2,397,248.00

$ 359.587.00

$ 2,756,835.00

 

The project funding breakdown is as follows:

 

Description

Amount

Measure K Fund (Fund 440)

 $ 2,100,000.00

SB1 (2025 Pavement Maintenance Project CIP ENG26001 savings)

 $    656.835.00

Total

 $ 2,756,835.00

 

 

Documents Attached:

1.                     Attachment 1 - Resolution

2.                     Attachment 2 - Location Map

3.                     Attachment 3 - Construction Contract