Skip to main content
Manteca CA banner
File #: 25-382    Version: 1 Name:
Type: Consent Status: Agenda Ready
File created: 7/17/2025 In control: CITY COUNCIL
On agenda: 8/19/2025 Final action:
Title: Adopt a resolution approving Plans and Specifications for the Wastewater Quality Control Facility (WQCF) Breakroom and Operator Control Room Remodel Project CIP 24047, authorizing a Call for Bids and authorizing the City Manager or their designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution.
Attachments: 1. Attachment 1 - Resolution, 2. Attachment 2 - Invitation to Bid, 3. Attachment 3 - Location Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

City Council Agenda

Memo to:

Manteca City Council

 

 

From:

Jose Jasso, Assistant City Manager/Interim Public Works Director

 

 

Prepared by:

George Montross, Deputy Director of Public Works/Water Resources

 

 

Date:

August 19, 2025

 

 

Subject:

Wastewater Quality Control Facility Breakroom and Operator Control Room Remodel Project - CIP 24047

 

Recommendation:

title    

Adopt a resolution approving Plans and Specifications for the Wastewater Quality Control Facility (WQCF) Breakroom and Operator Control Room Remodel Project CIP 24047, authorizing a Call for Bids and authorizing the City Manager or their designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution.

 

body

Background:

The City of Manteca WQCF, located at 2450 West Yosemite Avenue, has an existing breakroom which is undersized for this growing division.  The remodel project includes the conversion of an existing storage building into a multipurpose breakroom and training room with an accessible restroom addition as well as the renovation of the existing breakroom into the plant operation control room. Exterior improvements include a concrete patio with a metal canopy and improvements to the accessible path of travel.

 

The Engineer’s Estimate for the Project is $2,000,000. 

 

Fiscal Impact:

There is no fiscal impact associated with this action.

 

Documents Attached:

1.                     Attachment 1 - Resolution

2.                     Attachment 2 - Invitation to Bid

3.                     Attachment 4 - Location Map