Subject: |
Wastewater Quality Control Facility Breakroom and Operator Control Room Remodel Project - CIP 24047 |
Recommendation:
title
Adopt a resolution approving Plans and Specifications for the Wastewater Quality Control Facility (WQCF) Breakroom and Operator Control Room Remodel Project CIP 24047, authorizing a Call for Bids and authorizing the City Manager or their designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution.
body
Background:
The City of Manteca WQCF, located at 2450 West Yosemite Avenue, has an existing breakroom which is undersized for this growing division. The remodel project includes the conversion of an existing storage building into a multipurpose breakroom and training room with an accessible restroom addition as well as the renovation of the existing breakroom into the plant operation control room. Exterior improvements include a concrete patio with a metal canopy and improvements to the accessible path of travel.
The Engineer’s Estimate for the Project is $2,000,000.
Fiscal Impact:
There is no fiscal impact associated with this action.