City Council Agenda
Memo to:
Manteca City Council
From:
Michael Selling, Assistant Director of Engineering/City Engineer
Prepared by:
Toshiro Sessoms, Assistant Engineer;
Somporn Boonsalat, Deputy Director of Engineering
Date:
May 12, 2026
Subject:
Shasta Park Area Pavement Improvement Project 2.0 (bounded by Main Street, Louise Avenue, North Street, and SR 99)
Recommendation:
title
Adopt a resolution amending the Fiscal Year 2025-2026 Capital Improvement Program to include the Shasta Park Area Pavement Improvement Project 2.0 (District 3: bounded by Main Street, Louise Avenue, North Street, and SR 99), and assign a new Capital Improvement Project Number; approving the California Environmental Quality Act Notice of Exemption determination; approving the Plans and Specifications for the project; authorizing a Call for Bids; and authorizing the City Manager or designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution (Exempt from CEQA pursuant to 14 Cal. Code Regs. ? 15301(c)).
body
Background:
The City Council has stressed the importance of having a preventative pavement maintenance program in place to prolong existing pavement life and reduce more costly repairs in the future.
To expedite the construction schedule and optimize use of local funds, staff has prepared the Plans, Specifications, and Estimate (PS&E) for the Shasta Park Area Pavement Improvement Project 2.0 (Project). The Project includes: placement of asphalt overlay, microsurfacing, rubber cape seal, installation of ADA curb ramps, digout repairs, crack seal on various streets within the project area, and new striping.
The Project area is located in District 3 and is bounded by Main Street, Louise Avenue, North Street, and SR 99, see Attachment 2 - Location Map. The Engineer's Estimate is $2,100,000 and the Project qualifies for Measure K funding.
Staff has reviewed and determined that the Project is Categorically Exempt under t...