Manteca CA banner
File #: 24-606    Version: 1 Name:
Type: Consent Status: Agenda Ready
File created: 11/4/2024 In control: CITY COUNCIL
On agenda: 11/19/2024 Final action:
Title: Adopt a resolution accepting Public Improvements for Villa Ticino West Unit No. 6 (Tract 4117) subdivision; approving exoneration of the Performance Bond; approving exoneration of the Labor and Materials Bond six (6) months after the date of acceptance; and approving exoneration of the Warranty Bond twelve (12) months after the date of acceptance.
Attachments: 1. Attachment 1 - Resolution, 2. Attachment 2 - Construction Inspector Memorandum, 3. Attachment 3 - Location Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

City Council Agenda
Memo to:
Manteca City Council


From:
Kevin Jorgensen II, Director of Engineering/City Engineer


Prepared by:
Elizabeth Njuguna, Assistant Engineer


Date:
November 19, 2024


Subject:
Acceptance of Public Improvements - Villa Ticino West Unit No. 6

Recommendation:
title
Adopt a resolution accepting Public Improvements for Villa Ticino West Unit No. 6 (Tract 4117) subdivision; approving exoneration of the Performance Bond; approving exoneration of the Labor and Materials Bond six (6) months after the date of acceptance; and approving exoneration of the Warranty Bond twelve (12) months after the date of acceptance.

body
Background:
The City Council approved the Final Map and Improvement Agreement for Villa Ticino West Unit No. 6 on September 6, 2023. Villa Ticino West Unit No. 6 subdivided approximately 22.33 acres into 118 residential lots, and public rights-of-way. The estimated cost of the improvements was $3,034,175.82 as included in the Improvement Agreement.

The installed improvements include all underground utilities (both wet and dry), curb, gutter, sidewalk, street pavement, markings, street signage, street lighting, sewage systems, storm drainage systems, water systems, and perimeter fencing.

On August 20, 2024, the City Council approved partial acceptance of public improvements in accordance with the Subdivision Partial Acceptance Policy for the Villa Ticino West Unit No. 6 subdivision, Tract 4117.

The public improvements for Villa Ticino West Unit No. 6 have been completed in accordance with the approved improvement plans. Refer to the attached memorandum from the City Construction Inspector (Attachment 2).

In accordance with the City of Manteca Municipal Code, the Performance Bond will be exonerated upon acceptance of the improvements by City Council and submittal of a Warranty Bond. The Labor and Materials Bond will be exonerated six (6) months after the date of acceptance if no claims have been received by the Cit...

Click here for full text