Manteca CA banner
File #: 24-538    Version: 1 Name:
Type: Public Hearings Status: Agenda Ready
File created: 10/2/2024 In control: CITY COUNCIL
On agenda: 2/4/2025 Final action:
Title: Conduct a public hearing and adopt a resolution approving the Sewer Capacity Fee Nexus Study, setting charges for the Sewer Capacity Fee and the Interim Residential New Connection Fee, and authorizing the City Manager or designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution; Waive the first reading by substitution of the title and introduce an Ordinance of the City Council of the City of Manteca, State of California, repealing and replacing Chapter 13.12. Sewer Connection Charges.
Attachments: 1. Attachment 1 – Public Hearing Notice, 2. Attachment 2 – Resolution, 3. Attachment 3 - Exhibit “A” to Resolution - Sewer Capacity Fee Nexus Study, 4. Attachment 4 - Exhibit “B” to Resolution - Sewer Capacity Fee, 5. Attachment 5 – Ordinance, 6. Attachment 6 - Ordinance Redline, 7. Attachment 7 - Power Point
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
City Council Agenda
Memo to:
Manteca City Council


From:
Kevin Jorgensen II, Director of Engineering/City Engineer


Prepared by:
Somporn Boonsalat, Deputy Director of Engineering


Date:
February 4, 2025


Subject:
Hold a Public Hearing, Amending and replacing Chapter 13.12 of the Manteca Municipal Code, Adopt the Sewer Capacity Fee Nexus Study, and Adopt a Sewer Capacity Fee and an Interim Residential New Connection Fee

Recommendation:
title
Conduct a public hearing and adopt a resolution approving the Sewer Capacity Fee Nexus Study, setting charges for the Sewer Capacity Fee and the Interim Residential New Connection Fee, and authorizing the City Manager or designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution; Waive the first reading by substitution of the title and introduce an Ordinance of the City Council of the City of Manteca, State of California, repealing and replacing Chapter 13.12. Sewer Connection Charges.

body
Background:
On March 5, 2024, the City of Manteca (City) adopted the 2024 Wastewater Master Plan (2024 WWMP). With completion of the 2024 WWMP, staff now has an accurate accounting of the funding needed for the maintenance and operation of existing assets and development of future assets.

The City worked closely with its consultants at Stantec Consultant (Stantec) to develop the updated Sewer Capacity Fee Nexus Study (Attachment 3). The Nexus Study calculates a Sewer Capacity Fee that does not exceed the City's reasonable costs for existing and future sewer facilities that are of proportionate benefit to new development.

City staff met with representation for the Building Industry Association of the Greater Valley (BIA) and provided the Nexus Study for review. The BIA provided staff with some minor questions/comments that were subsequently addressed, and the BIA responded having no further comments and supportive of the Nexus Study.

Chapter 13.12 of the Manteca Municipal Code s...

Click here for full text