City Council Agenda
Memo to:
Manteca City Council
From:
Kevin Jorgensen II, Director of Engineering/City Engineer
Prepared by:
Lauren Silva, Associate Engineer
Date:
April 7, 2026
Subject:
Acceptance of Public Improvements - The Trails of Manteca, Unit Nos. 1-4
Recommendation:
title
Adopt a resolution accepting Public Improvements for The Trails of Manteca, Unit Nos. 1-4 (Tracts 3729, 3734, 3735 and 3736, respectively) located at the southwest corner of the W. Woodward Avenue and Joshua Street intersection; approving exoneration of the Performance Bonds; approving exoneration of the Labor and Materials Bonds six (6) months after the date of acceptance; and approving exoneration of the Warranty Bonds twelve (12) months after the date of acceptance.
body
Background:
The City Council approved the Final Maps and Improvement Agreements for The Trails of Manteca on June 7, 2022. The Trails of Manteca, Unit Nos. 1-4 subdivided approximately 39.3 acres of land into 259 residential lots, a park/storm drain basin lot, landscape lots, public rights-of-way and a 268.58 lot which will be subdivided and developed with future units of the approved subdivision. The estimated cost of the improvements is $16,762,281.91, as included in the Improvement Agreements.
The installed improvements include all underground utilities (both wet and dry), curb, gutter, sidewalk, street pavement, street markings, street signage, street lighting, sewage systems, storm drainage systems, water systems, perimeter fencing and the park.
The public improvements for the The Trails of Manteca, Unit Nos. 1-4 have been completed in accordance with the approved improvement plans. Refer to the attached memorandum from the City Construction Inspector (Attachment 2).
In accordance with the City of Manteca Municipal Code, the Performance Bonds will be exonerated upon acceptance of the improvements by City Council and submittal of a Warranty Bonds. The Labor and Materials Bonds will be exone...
Click here for full text