City Council Agenda
Memo to:
Manteca City Council
From:
Michael Selling, Assistant Director of Engineering/City Engineer
Prepared by:
Lauren Silva, Associate Engineer
Date:
July 16, 2026
Subject:
Acceptance of Public Improvements - Wackerly Estates Subdivision
Recommendation:
title
Adopt a resolution accepting Public Improvements for Wackerly Estates (Tract 4048) located along W. Woodward Avenue approximately 700' east of its intersection with S. Airport Way; approving exoneration of the Performance Bond; approving exoneration of the Labor and Materials Bond six (6) months after the date of acceptance; and approving exoneration of the Warranty Bond twelve (12) months after the date of acceptance.
body
Background:
The City Council approved the Final Map and Improvement Agreement for Wackerly Estates on June 15, 2021. Wackerly Estates subdivided approximately 14 acres of land into 60 residential lots, a storm drain basin lot, and public rights-of-way. The estimated cost of the improvements is $1,957,326.80, as included in the Improvement Agreement.
The installed improvements include all underground utilities (both wet and dry), curb, gutter, sidewalk, street pavement, street markings, street signage, street lighting, sewage systems, storm drainage systems, water systems, perimeter fencing and the storm drain basin.
The public improvements for the Wackerly Estates Subdivision have been completed in accordance with the approved improvement plans. Refer to the attached memorandum from the City Construction Inspector (Attachment 3).
In accordance with the City of Manteca Municipal Code, the Performance Bond will be exonerated upon acceptance of the improvements by City Council and submittal of a Warranty Bond. The Labor and Materials Bond will be exonerated six (6) months after the date of acceptance if no claims have been received by the City for lack of payment. The Warranty Bond will be exonerated twelve (12) months after the date of acceptance,...