City Council Agenda
Memo to:
Manteca City Council
From:
Kevin Jorgensen II, Director of Engineering/City Engineer
Prepared by:
Lauren Silva, Associate Engineer
Date:
April 1, 2025
Subject:
Acceptance of Public Improvements - Denali, Unit No. 3
Recommendation:
title
Adopt a resolution accepting Public Improvements for Denali, Unit No. 3 (Tract 4122); approving exoneration of the Performance Bond; approving exoneration of the Labor and Materials Bond six (6) months after the date of acceptance; and approving exoneration of the Warranty Bond twelve (12) months after the date of acceptance.
body
Background:
The City Council approved the Final Map and Improvement Agreement for Denali, Unit No. 3 on October 17, 2023. Denali, Unit No. 3 subdivided approximately 12.4 acres of land into 66 residential lots, landscape lots, and public rights-of-way. The estimated cost of the improvements is $4,492,891.29, as included in the Improvement Agreement.
The installed improvements include all underground utilities (both wet and dry), curb, gutter, sidewalk, street pavement, street markings, street signage, street lighting, sewage systems, storm drainage systems, water systems, perimeter fencing and the park.
The public improvements for Denali, Unit No. 3 have been completed in accordance with the approved improvement plans. Refer to the attached memorandum from the City Construction Inspector (Attachment 2).
In accordance with the City of Manteca Municipal Code, the Performance Bond will be exonerated upon acceptance of the improvements by City Council and submittal of a Warranty Bond. The Labor and Materials Bond will be exonerated six (6) months after the date of acceptance if no claims have been received by the City for lack of payment. The Warranty Bond will be exonerated twelve (12) months after the date of acceptance, once the improvements have been re-inspected and the work is found to be in good condition as determined by the City Engineer or any defe...
Click here for full text