File #: 25-517    Version: 1 Name:
Type: Consent Status: Agenda Ready
File created: 9/30/2025 In control: CITY COUNCIL
On agenda: 10/21/2025 Final action:
Title: Adopt a resolution determining Diede Construction, Inc. to be the lowest responsive and responsible bidder for the Wastewater Quality Control Facility (WQCF) Breakroom and Operator Control Room Remodel Project (CIP 24047), awarding the construction contract to Diede Construction, Inc. in the amount of $1,909,000 and approving a project construction contingency not-to exceed $190,900 (10%), for a total construction budget of $2,099,900; and authorizing the City Manager or designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution
Attachments: 1. Attachment 1 - Resolution, 2. Attachment 2 - Construction Contract, 3. Attachment 3 - Location Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
City Council Agenda
Memo to:
Manteca City Council


From:
Jose Jasso, Assistant City Manager / Interim Director of Public Works


Prepared by:
George Montross, Deputy Director of Public Works / Water Resources


Date:
October 21, 2025


Subject:
Award Construction Contract to Diede Construction, Inc. for the Wastewater Quality Control Facility Breakroom and Operator Control Room Remodel Project - CIP 24047

Recommendation:
title
Adopt a resolution determining Diede Construction, Inc. to be the lowest responsive and responsible bidder for the Wastewater Quality Control Facility (WQCF) Breakroom and Operator Control Room Remodel Project (CIP 24047), awarding the construction contract to Diede Construction, Inc. in the amount of $1,909,000 and approving a project construction contingency not-to exceed $190,900 (10%), for a total construction budget of $2,099,900; and authorizing the City Manager or designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution

body
Background:
The City of Manteca WQCF, located at 2450 West Yosemite Avenue, has an existing breakroom which is undersized for this growing division. The remodel project includes the conversion of an existing storage building into a multipurpose breakroom and training room with an accessible restroom addition as well as the renovation of the existing breakroom into the plant operation control room. Exterior improvements include a concrete patio with a metal canopy and improvements to the accessible path of travel.

On August 19, 2025, City Council authorized a Call for Construction Bids and approved the Plans, Specifications and Estimate for this Project.

Two bids were received and opened on September 24, 2025:
Company
Total Bid:
Diede Construction, Inc.
$1,909,000
C. Overaa and Company
$2,236,000

The low bid was within the staff's expected cost range and recommends accepting the total bid.

Fiscal Impact:

Staff recommends Council approve awardi...