City Council Agenda
Memo to:
Manteca City Council
From:
Kevin Jorgensen II, Director of Engineering/City Engineer
Prepared by:
Lauren Silva, Associate Engineer
Date:
October 21, 2025
Subject:
Acceptance of Public Improvements - Drain 5 Relocation
Recommendation:
title
Adopt a resolution accepting Public Improvements for the Drain 5 Relocation for the Villa Ticino West Tentative Map; approving exoneration of the Performance Bond; approving exoneration of the Labor and Materials Bond six (6) months after the date of acceptance; and approving exoneration of the Warranty Bond twelve (12) months after the date of acceptance.
body
Background:
The City Council approved the Improvement Agreement for the Drain 5 Relocation on September 6, 2023. The estimated cost of the improvements is $4,493,088.35, as included in the Improvement Agreement.
The installed improvements include the piping, headwall structures and a new outfall at the French Camp Outlet Canal to realign Drain 5 so it follows the approved route on the Villa Ticino West Tentative Map.
The public improvements for the Drain 5 Relocation have been completed in accordance with the approved improvement plans. Refer to the attached memorandum from the City Construction Inspector (Attachment 2).
In accordance with the City of Manteca Municipal Code, the Performance Bond will be exonerated upon acceptance of the improvements by City Council and submittal of a Warranty Bond. The Labor and Materials Bond will be exonerated six (6) months after the date of acceptance if no claims have been received by the City for lack of payment. The Warranty Bond will be exonerated twelve (12) months after the date of acceptance, once the improvements have been re-inspected and the work is found to be in good condition as determined by the City Engineer or any defects have been repaired.
Fiscal Impact:
There is no fiscal impact with this action.
Documents Attached:
1. Attachment 1 - Resolution
2. Attachment 2 ...
Click here for full text