City Council Agenda
Memo to:
Manteca City Council
From:
Michael Selling, Assistant Director of Engineering/City Engineer
Prepared by: Lauren Silva, Associate Engineer
Date: November 17, 2026 Subject: Acceptance of Public Improvements – Griffin Park, Unit No. 8
Recommendation:
title
Adopt a resolution accepting Public Improvements for Griffin Park, Unit No. 8 (Tract 4148) located between S. Main Street and Tinnin Road, south of Hot Springs Drive and Antone Raymus Parkway; approving exoneration of the Performance Bond; approving exoneration of the Labor and Materials Bond six (6) months after the date of acceptance; and approving exoneration of the Warranty Bond twelve (12) months after the date of acceptance.
body
Background:
The City Council approved the Final Map and Improvement Agreement for Griffin Park, Unit No. 8 on November 19, 2024. Griffin Park, Unit No. 8 subdivided approximately 34 acres of land into 122 residential lots, a South San Joaquin Irrigation District lot and public rights-of-way. The estimated cost of the improvements is $7,192,696.92, as included in the Improvement Agreement.
The installed improvements include all underground utilities (both wet and dry), curb, gutter, sidewalk, street pavement, street markings, street signage, street lighting, sewage systems, storm drainage systems, water systems, and perimeter fencing.
The public improvements for the Griffin Park, Unit No. 8 have been completed in accordance with the approved improvement plans. Refer to the attached memorandum from the City Construction Inspector (Attachment 3).
In accordance with the City of Manteca Municipal Code, the Performance Bond will be exonerated upon acceptance of the improvements by City Council and submittal of a Warranty Bond. The Labor and Materials Bond will be exonerated six (6) months after the date of acceptance if no claims have been received by the City for lack of payment. The Warranty Bond will be exonerated tw...
Click here for full text