Manteca CA banner
File #: 19-242    Version: 1 Name:
Type: Consent Status: Agenda Ready
File created: 5/15/2019 In control: CITY COUNCIL
On agenda: 6/4/2019 Final action:
Title: Adopt a resolution accepting CenterPoint Intermodal Center Off-Site Improvements; approving exoneration of the Performance Bond; and approving exoneration of the Labor and Materials Bond six (6) months after the date of acceptance.
Attachments: 1. Attachment 1 - Resolution, 2. Attachment 2 - Location Map, 3. Attachment 3 - Construction Inspector's Memorandum
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

City Council Agenda

 

Memo to:                                 Manteca City Council

 

From:                                            Greg Showerman, Community Development Director

 

Prepared by:           Lauren Silva, Assistant Engineer

 

Date:                                            June 4, 2019

 

Subject:                                 CenterPoint Intermodal Center Off-Site Improvements Acceptance

 

title

Adopt a resolution accepting CenterPoint Intermodal Center Off-Site Improvements; approving exoneration of the Performance Bond; and approving exoneration of the Labor and Materials Bond six (6) months after the date of acceptance.

 

body

Background:

The CenterPoint Intermodal Center Off-Site Improvements have been completed in accordance with the approved plans, specifications, and adopted City Standards.  Refer to the attached memorandum from the City Construction Inspector.

 

Fiscal Impact:

There is no fiscal impact associated with this action.

 

Documents Attached:

1.           Attachment 1 - Resolution

2.           Attachment 2 - Location Map

3.           Attachment 3 - Construction Inspector’s Memorandum