City Council Agenda
Memo to: Manteca City Council
From: Kevin Jorgensen II, Director of Engineering/City Engineer
Prepared by: Lauren Silva, Associate Engineer
Date: September 7, 2021
Subject: Traffic Signal Modification for Chevron at N. Main Street and
Lancaster Drive
title
Adopt a resolution accepting the traffic signal modification at the intersection of N. Main Street and Lancaster Drive and approving exoneration of the Performance Bond, upon receipt of the Warranty Bond and approving exoneration of the Labor and Materials Bond six (6) months after the date of acceptance and approving the exoneration of the warranty bond one year after the date of acceptance.
body
Background:
On May 19, 2020, City Council approved the Improvement Agreement traffic signal modification at the intersection of N. Main Street and Lancaster Drive. This work was required by the Conditions of Approval for the project. The estimated cost of the signal modification work was approximately $172,000.
The signal modification has been completed in accordance with the approved plans. Refer to the attached memorandum from the City Construction Inspector (Attachment 3).
In accordance with the Improvement Agreement and the City’s Municipal Code, once City Council has accepted the work, the Performance Bond will be exonerated, after the City receives the Warranty Bond. The Labor and Materials Bond can be exonerated six (6) months after the date of acceptance.
Fiscal Impact:
There is no fiscal impact associated with this action.
Documents Attached:
1. Attachment 1 - Resolution
2. Attachment 2 - Location Map
3. Attachment 3 - Construction Inspector Memo