File #: 24-082    Version: 1 Name:
Type: Consent Status: Agenda Ready
File created: 2/6/2024 In control: CITY COUNCIL
On agenda: 3/5/2024 Final action:
Title: Adopt a resolution approving the 2024 Wastewater Master Plan and authorizing the City Manager or designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution.
Attachments: 1. Attachment 1 - Resolution, 2. Attachment 2 - Final Wastewater Master Plan
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
City Council Agenda
Memo to:
Manteca City Council


From:
Kevin Jorgensen II, Director of Engineering/City Engineer


Prepared by:
Somporn Boonsalat, Acting Deputy Director of Engineering


Date:
March 5, 2024


Subject:
Final Wastewater Master Plan (CIP 22040)

Recommendation:
title
Adopt a resolution approving the 2024 Wastewater Master Plan and authorizing the City Manager or designee to take all appropriate actions necessary to carry out the purpose and intent of the resolution.

body
Background:
The previous Wastewater Quality Control Facility (WQCF) Master Plan was completed in 2006 by Nolte Associates, Incorporated.

The previous Wastewater Collection System (WWCS) Master Plan Update was completed in 2013 by NV5 (previously Nolte Associated, Inc.).

On October 19, 2021, the City of Manteca (City) entered into a professional services agreement with Stantec Consulting Services Incorporated (Stantec) for the preparation of the City's Wastewater Master Plan and Sewer Rate Study. The Capital Improvement Program project (CIP 22040) objective is to combine the WQCF and WWCS Master Plans into one document to improve system resiliency, minimize maintenance and operation costs, account for new regulations, and evaluate impacts due to drought.

On December 5, 2023, staff shared a presentation with City Council on the current status of the Final Draft Wastewater Master Plan (WWMP). The 2024 Final WWMP is now complete and includes the most current information available from the General Plan Update. This Master Plan is part of the overall Wastewater Master Plan & Rate Study project (CIP 22040).

With completion of the 2024 Final WWMP, staff now has an understanding of the funding needed for the maintenance and operation of existing assets and development of future assets. Information from the 2024 Final WWMP will be used to determine appropriate rate increases. These rates have not changed since 2010 and have thus significantly delayed necessary maintenance p...

Click here for full text